Print Friendly, PDF & Email

Project Detail

Peaslee Switchyard

   

Location: Kingston, NH

Description: Above grade construction of a new 115kV, four bay switchyard, utilizing a breaker and a half scheme. ESB utility division crews erected all above ground steel plus pulled fiber optic cable into two adjacent substations. The project was designed using NU IEC 61850 and bulk power separation standards. A separate tap yard, located six miles away, was also constructed.

Client:   Eversource Energy

Completion Date: 2016