Cabot Station Electric Generating Plant

 

 

 

 

 

 

 

Location: Montague, MA

Description: The E.S. Boulos Company (E.S. Boulos) and Harlan Electric Company (Harlan Electric) recently completed work on the Cabot Station Generating Plant in Montague, Massachusetts.

Crews from E.S. Boulos concentrated on the interior substation work, while Harlan Electric line workers focused on the transmission lines leading to and from the station. The scope of work included installing several new cable trays, re-running cables to provide proper spacing, upgrading aluminum bus and taps, reinforcing the existing lattice towers, and replacing the original conductor with a bundled 2500 aluminum alloy conductor.

Read more.

Completion Date: December 2019

Work Performed By: E.S. Boulos Company and Harlan Electric Company, subsidiaries of MYR Group

Client: FirstLight Power

Engineer: TRC Companies, Inc.